الأخبار
أنت هنا: الصفحة الرئيسية » أخبار » Projects » Zhongjie era Steel Structure Frame Overpass Project

Zhongjie era Steel Structure Frame Overpass Project

نشر الوقت: 2021-10-26     المنشأ: محرر الموقع

Introduction of Zhongjie era Steel Structure Frame Overpass Project 


Zhongjie Times Square overpass project is the first Cross Street overpass project in Pingdu. The whole project is composed of three overpasses. The length of the straight overpass on the east side is 56.3 meters and the width is 5 meters. The length of the straight overpass on the west side is 49 meters and the width is 5 meters. The diameter of the main bridge surface of the central circular overpass is 56 meters. The narrowest part is 6.5 meters and the maximum width is 12 meters. The construction of the overpass on Hongqi Road can avoid the interference of people and vehicles To improve the road capacity, and effectively solve the problem of efficiency and safety of a large number of people crossing the street.

After completion, it will become the most characteristic commercial block with urban flavor in the main urban area of Pingdu City, as well as the landscape landmark and cultural landmark of Pingdu.




منذ عام 1997

معلومات عنا
Chingdao Xinguangzheng الصلب هيكل المحدودة، تأسست في عام 1997 هي واحدة من الشركات الرائدة في الصلب الشركات في شمال الصين.
اتصل بنا

اتصل بنا

Copyright © 2021 Qingdao Xinguangzheng Steel Structure Co., Ltd. All Rights Reserved. Support Leadong | Sitemap